Manage and Protect the Microsoft Cloud Platform

New Releases

5nine Manager 6.0 for Hyper-V Optimizes Virtual Infrastructure to Full Capacity

CHICAGO (December 3, 2014) – 5nine Manager 6.0 for Hyper-V is available today from 5nine Software, the leading global Hyper-V virtualization management and security provider. 5nine Manager 6.0 for Hyper-V is an easy-to-use and affordable management solution for Microsoft Hyper-V, providing many of the key features of Microsoft System Center VMM needed for everyday Hyper-V management. The latest version is now powered up with several disruptive innovation product enhancements, such as Dynamic Optimization and New FreeRDP version integration. 5nine Manager for Hyper-V will allow customers to gain granular control over their virtual infrastructure and virtual resources utilization.

"Today's release of 5nine Manager 6.0 for Hyper-V will completely change the way our customers act in everyday Hyper-V management. Manual host control and allocation in running VMs is no longer needed, and the new features will utilize the capacity of our customers' virtual infrastructure resources and save the mission-critical applications from failure," said Brian Zimmerman, 5nine Senior Vice President. “We follow the latest market tendencies and listen to our customers' needs to provide continuous innovation of our products."

Virtual infrastructure is constantly changing, which makes controlling and utilizing existing resources challenging. Running hundreds and thousands of Virtual Machines requires system administrators to constantly monitor the load capacity of the existing servers. Even a short-term failure of a single application could immobilize work of the company, resulting in unpredictable financial loss. System administrators can face these challenges with 5nine Software's new 5nine Manager 6.0 for Hyper-V with Dynamic Optimization.

Dynamic Optimization evaluates the current state of each host on your Hyper-V Server. It automatically moves Virtual Machines from one host to another based on resource utilization, regardless of how many hosts are involved. This approach allows system administrators to optimize all resources within the network and avoid the overload and shutdown of its hosts. Each host runs on the optimal level of capacity, thereby decreasing the resource usage and the importance for continuous system monitoring. With 5nine Manager 6.0 for Hyper-V, customers can be confident that their mission-critical application will always operate full-time.

5nine Manager for Hyper-V allows system administrators to control and connect to Virtual Machines at any moment. In this new version of 5nine Manager for Hyper-V, 5nine Software includes an enhanced FreeRDP connection view to connect from core Hyper-V servers as efficiently as from the GUI ones. Enjoy the freedom of connecting to Virtual Machines in multiple ways for high operational stability. New FreeRDP Guest Console integration will meet the customers’ requirements in a stable additional way to access and configure their Virtual Machines.

5nine Manager 6.0 for Hyper-V is available immediately. It is priced per host, and pricing begins at $199. For more information or to download a free 30-day trial version, please visit: www.5nine.com/manager.